Within the design contour of the hydrocarbon storage project in production sharing agreements, there should be no tectonic disturbances that cause a decrease in the sealed base and reserve plugs.
The tightness of the detected violations, as well as the well casing environment, must be tested in industrial gas injection by means of a technological scheme of exceeding the working pressure above the hydrostatic pressure.
Technological fastenings of casing columns of underground storage facilities must:
a) evenly distribute the pressure and volume of cement mortar along the column to the wellhead throughout the wellbore;
b) replace the industrial fluid with cement mortar over the entire height.
The result of fastening the well casing strings should be in all layers of the well section.
The core is taken in the interval of reservoir layers and overlying rocks, which protrude as hatches above the accumulating layers.
The number of wells from which cores need to be taken is determined by the exploration project.
The purpose of the core is to determine reliable data on filtration capacities.
At the same time, the drilling process itself is accompanied by a complex of industrial and geophysical measurements, provided by geological and technical tasks.
The pressing of the intermediate and production string must be carried out according to the developed instructions for testing wells for tightness and the results of the work must be drawn up in the form of acts.
In turn, exploration of aquifer structures for hydrological study is based on the following indicators:
1) static groundwater levels and their regular change;
2) hydroconductivity and piezoconductivity;
3) the level of ionic-salt solutions and their relationship with hydrocarbons.
Hydrological characteristics of exploration wells are performed in the following sequence:
1) pumping out formation water;
2) deep pressure measurements;
3) chemical analysis of water samples;
4) determination of the water inflow interval.
Hydrological characteristics are built on the basis of the formed plan.