Saturday, August 29, 2026

Basic requirements for assessing the suitability of facilities for underground gas storage

Subsoil users, in particular large investors in production sharing agreements in Ukraine, are thinking not only about how to increase production, but also about how to save raw materials.

Against the backdrop of constant shelling of infrastructure, the Ukrainian government is thinking about storage projects for hydrocarbons.

Of course, the topic of storage will be a hot topic for investors, so let's try to figure out what the requirements are for a storage project.

Aquifers or depleted deposits are used as objects for storing hydrocarbons.

Suitable for storing, for example, gas, are objects with porosity with an average area of ​​10-15% aquifers or occurrence in reservoirs of up to 5% in fractured rocks.

The assessment of the state of the depth of aquifers is carried out in parameters up to 1000 m.

For a reliable assessment of the suitability of objects in terms of capacities and reservoir properties, the density of the drilling grid should be selected taking into account the flowability of the layers and the distribution of geological and physical indicators.

n this case, the core removal rate should be no less than 75%. 

When penetrating exploration wells of low-cement reservoirs, the core removal rate should be no less than 50%.

The values ​​of the object are verified by calculation under conditions of inadmissibility of the appearance of vertical cracks at maximum gas pressure.

Gas permeability is calculated by laboratory tests so that the excess gas pressure is greater than the hydrostatic pressure.

To ensure the long-term operation of storage facilities in the cross-section of planes to match the contour of the aquifer structure above the reservoir layer, buffer gas accumulations should be established in the event of column overflows.

The use of aquifers is not allowed during the period of cyclic operation. The condition and tightness of the overlying rocks of the well are monitored.

In depleted formations where no fluid overflows are observed, gas saturation is determined by hydrodynamic methods based on the water sampled and the separated gas.

Saturday, August 22, 2026

The role of the mounting diversion in underground storage construction

To form artificial deposits in complexly formed structures that interact with each other, it is necessary to have data on the vertical pressure distribution.

In this case, it is recommended to equip two observation wells, one of which opens the upper part of the deposits, and the second well the lower part of the deposits.

Various types of costs and losses (well testing, blowdowns, emergency gushing and runoff) should be reflected in historical records.

The mounting diversion is issued before the storage facility is built.

To obtain a mounting diversion, the investor, together with the author of the technological scheme, provides the following to the geology and subsoil authorities:

- an explanatory note (administrative provisions, general data on the site, indicating the list of infrastructure, the need for the construction of a storage facility, the list and characteristics of horizons intended for hydrocarbon injection);

- information on disappearing and balance reserves;

- an extract from the technological system and operation of the storage facility, which indicates the number of layers, the main parameters for active and buffer volumes of hydrocarbons, the development period, permissible maximum and minimum pressures;

- the area of ​​distribution of hydrocarbons in the layer intended for drilling, the design of wells, methods and frequency of testing them for tightness;

- a well inspection report;

- copy of the protocol on approval of the technological scheme for the creation and operation of wells;

- copy of the topographic plan with the mounting diversion marked;

- copy of the topographic plan with the drawing of the mounting diversion;

- structural maps for each layer with the indication of the contour lines;

- prefabricated geological section;

- cross-sectional geological profile.

The final stage of the mounting diversion process is obtaining a conclusion on the suitability of the depleted horizons and aquifers for use in order to preserve hydrocarbons in the storage facility.

Saturday, August 15, 2026

Design of underground gas storage facilities

Investors in production sharing agreements, as well as subsoil users operating under special permits for hydrocarbon extraction, are interested in developing a storage network, and sometimes express a desire to become an investor in a storage construction project.

What does the construction of a storage facility start with?

Technical documentation for the construction of an underground storage facility can be developed for the structural aquifer or depleted source as a whole, as well as separately for aquifers (horizons) or depleted deposits.

In any case, it is necessary to carry out technical and economic calculations to confirm the priority of development of horizons or deposits, taking into account the possibilities of expanding storage facilities.

If it is necessary to make significant changes to the approval of technological schemes, the latter is revised.

The technological scheme section covers the following issues:

- confirmation based on structural constructions and gas-dynamic calculations of the volumes of active and buffer gas, the contour of gas distribution over the area;

- linking these volumes with data on gas distribution irregularities;

- data on gas saturation of the region;

- injection pressure at the end of gas withdrawal;

- selection of the number, confirmation of the location and design of production and exploration wells;

- development of a survey map of the area with the marking of the gas transportation system, place of origin, main consumers;

- development of a map in the base of the reservoir, aquifer;

- development of maps of the geological and geophysical section;

- development of profiles on aquifers;

- development of a gas preparation scheme.

The storage facility development project must include designs, specify the volume and cost of all work, and compile technical, economic, and other indicators.

Compressor units, gas industry and auxiliary equipment must be highly productive and reliable means of operations.

Saturday, August 8, 2026

The Place of Production Sharing Agreements in the Critical Raw Materials Act

In 2024, the European Parliament and the European Council adopted Regulation 1252 establishing a framework for ensuring a secure and sustainable supply of critical raw materials and amending Regulations (EU) No 168/2013, (EU) 2018/858, (EU) 2018/1724 and (EU) 2019/1020.

In terms of role and significance, this act of the European Union carries a political and legal statement rather than specific positions and changes in the field of subsoil use.

A notable feature is that Act 1252 of April 11, 2024, as a whole, is more concerned with the interweaving of environmental and energy measures with reference to the future foundations of sustainable development plans and successfully implemented decarbonization.

What are the main trends of this Act:

- critical minerals - the vanguard of economic development;

- mining waste has economic benefits;

- export-import supplies under quotas;

- enhanced environmental monitoring.

What are the main shortcomings of this Act:

- geological activities are losing relevance, marketing is progressing;

- the search for new deposits is encouraged, but not stimulated;

- lack of market mechanisms to influence the pricing of raw materials.

In my opinion, the weakness of Act 1252 is that subsoil use is positioned more as an energy sector than as an independent industry.

It seems that subsoil use enjoys a certain autonomy, the European Union's policy is more focused on the development of alternative energy sources.

At the same time, the importance of the advancement of technologies in alternative energy sources is neglected.

That is why Act 1215 is more of a political manifesto.

The Critical Raw Materials Act focuses primarily on securing access to critical raw materials and strengthening the different stages of the raw materials value chain. It provides mechanisms for identifying Strategic Projects, facilitating permitting, supporting investment and developing national exploration programmes.

At the same time, the Regulation pays considerably less attention to the contractual and economic mechanisms through which the development of mineral resources can actually be structured and financed.

In this context, Production Sharing Agreements remain largely in the background.

This does not mean that PSAs are incompatible with the objectives of the Critical Raw Materials Act.

 Rather, it reflects a broader feature of the EU regulatory approach: the Act establishes objectives and enabling conditions for resource development, while leaving many of the fundamental mechanisms of subsoil use to national legal systems.

This raises an important question. 

If the EU seeks to increase the extraction of critical raw materials within the Union and attract investment into projects involving significant geological and financial risks, should greater attention also be given to the contractual models capable of allocating these risks between the state and investors?

Production Sharing Agreements may be one of the mechanisms worth considering in this context.

Saturday, August 1, 2026

Specifics of hydrological research on exploratory wells

During the exploration of aquifer structures, hydrological studies usually cover all aquifers of the studied areas.

However, the completeness of hydrological studies is based on the following indicators:

a) static groundwater level;

b) productive characteristics of wells;

c) ionic-salt solutions and their complexes;

d) relationship with hydrocarbons;

e) gas composition of groundwater.

In order to study the hydrological characteristics of exploration wells and to fulfill the terms of production sharing agreements, the following are carried out:

- pumping out of formation water until a constant density and chemical composition of water is achieved;

- mouth and depth measurements of pressure and temperature, static water level, removal of indicator characteristics and pressure return;

- determination of water inflow intervals and productivity of the formation being worked.

To begin hydrological studies of exploratory wells, the following package of research and technical documents should be prepared:

- hydrological study plan;

- development of geological study guidelines from a scientific institution;

- conclude a contract and prepare a technical task for conducting industrial geophysical measurements.

At the same time, the geological and industrial initial data should reflect:

1) general characteristics of the exploration area;

2) a brief overview of geological research;

3) a description of settlements within the contour of the deposit;

4) results of seismic surveying;

5) results of drilling operations;

6) lithological and stratigraphic characteristics of the area;

7) geological and geophysical characteristics of aquifers and control horizons of gas accumulations

Thus, the completeness of the hydrological study depends on the scope of planned work based on ready-made calculations.

Design of pilot-industrial field development

Based on the approved technological indicators for the field development, project documents are prepared for its development (up to 5 years)...