Tuesday, November 17, 2026

Design of pilot-industrial field development

Based on the approved technological indicators for the field development, project documents are prepared for its development (up to 5 years).

In the project documents for development (first phase), issues of collecting, preparing, and transporting main and by-product products, as well as disposing of formation water, are addressed.

The pilot-industrial development project should include:

- the geological structure of the deposit or exploration area (stratigraphy, tectonics, characteristics of reservoir properties of productive horizons, physicochemical characteristics of oil, gas, and formation water);

- initial geological and industrial information for designing technological parameters (results of hydrodynamic studies, parameters of physical and chemical characteristics of fluids, study of thermobaric conditions);

- field development technology;

- equipment and technology for advancing wells (field development mode, choice of development system);

- key technical and economic indicators of the field.

Economic indicators for development options are calculated based on the level of hydrocarbon production. The results of exploration and prospecting work serve as the initial information for preparing pilot-industrial development projects.

In pilot-industrial development projects, the geological-structural plans of productive wells are justified to complete the geological cycle.

In the technical document for the pilot-industrial development, the following are justified:  

- the necessity of drilling advance wells;  

- the levels of oil and gas production, condensate, water, and injection of working agents for reservoir impact.

- filtration-capacity properties of productive horizons.

Friday, November 13, 2026

Preparation of oil, gas, and gas condensate fields for reserve estimation

In order to get reliable information for an accurate calculation of hydrocarbon reserves for approval, an experimental industrial development is being carried out.

To calculate hydrocarbon reserves and design field development systems during the geological exploration process, the following characteristics must be identified:

- geological and structural features of the reservoirs;

- limit and average parameters of the productive horizon reservoirs, their distribution across the area and in cross-section;

- filtration characteristics of the reservoirs based on the results of gas-dynamic studies;

- positions of oil-water and gas-oil contacts;

- physical and chemical properties of formation fluids.

At the site planned for pilot-industrial development, there should be productive exploration and appraisal wells, with study results that provide the necessary information to prepare the project.

Before starting pilot-industrial development in these wells, the following should be carried out: 

- geological and industrial research and geophysical studies based on the physical-geological characteristics of the layers;

- study the physical and chemical properties of oil, gas, and condensate;

- determine the presence or absence of an oil rim;

- provide a justified assessment of the feasibility of developing a condensate field under a gas reservoir depletion regime without pressure maintenance;

- resolve issues of product transportation and the use of associated minerals;

- disposal of waste/industrial water;

- obtain permits for land development projects and approvals from the State Labor Service of Ukraine.

Sunday, November 8, 2026

Analysis of access to mining activities

Subsoil users and investors are looking for transparency from governments when it comes to submitting and evaluating reports and carrying out predictable administrative procedures.

The state's step toward the request of subsoil users and investors is understanding the needs for digitalization.

Given that Ukraine is of interest to foreign participants in the subsoil market, we are reviewing the geological systems and registers of Ukraine.

Extractive Industries Transparency Initiative

In 2013, Ukraine joined the Extractive Industries Transparency Initiative – an international standard that involves disclosing information about the state of the country's extractive sector.

The goal of implementing IETI in Ukraine is to ensure transparency in managing the country's natural resources. Currently, 55 countries around the world are implementing the IETI Standard.

To prepare such a report, as well as to reconcile data on payments to the state from companies engaged in the extraction of natural resources, the country chooses an Independent Administrator – an independent company with the relevant experience. 

The Ministry of Energy of Ukraine is responsible for implementing the Extractive Industries Transparency Initiative in Ukraine in accordance with the Law of Ukraine "On Ensuring Transparency in the Extractive Industries".

Starting from 2015-2025, annual reports have been published showing how many companies are working in the extractive industries, how much tax they’ve paid to the government, and which companies are willing or not willing to show their results.

To organize information on payments and extraction volumes, the Ukrainian Extractive Industry Data Portal is in operation. 

It's an initiative for transparency – an electronic system for submitting and analyzing reports. You can find information about business entities, regardless of ownership, that carried out mining activities and transported oil and natural gas across Ukraine, as well as the executive authorities that received payments from companies in the extractive industries.

The Unified State Electronic Geoinformation System for Subsoil Use

In 2023, the Cabinet of Ministers of Ukraine Resolution No. 511 dated 19.05.2023 established the Unified State Electronic Geoinformation System for Subsoil Use. 

The components of the USEGS are managed by the State Service of Geology and Subsoil of Ukraine and state enterprises where the State Service of Geology is a founder ("Geological Portal").

A unified geoinformation system is a set of interconnected information systems, registries, and databases, software-information complexes, software-hardware and technical electronic communication tools that ensure the combination of certain information resources in the field of subsoil use, the processing and protection of information, as well as internal and external information interaction.

Access to the USEGS is provided through prior registration using a qualified electronic service key (QES), but the Geoinformation System itself is mostly aimed at participants in the subsoil use market and government authorities rather than the general public.

Individuals and legal entities have more limited access due to the "low authorization" level.

As of today, registered users among individuals and legal entities (non-professional subsoil users) have access to limited information, which mostly concerns statistical data.

Components of the Unified State Electronic Geoinformation System for Subsoil Use (Geological Portal):

-State Register of Special Permits for Subsoil Use;

-State Register of Oil and Gas Wells;

-State Register of Artesian Wells;

-Catalog of Geological Information;

-Information on State Registration of Geological Exploration Works;

-Information on Applications for Obtaining, Extending the Validity, or Making Changes to Special Permits for Subsoil Use.

It should be noted that due to the martial law enacted by the Decree of the President of Ukraine “On the Introduction of Martial Law in Ukraine” dated 24.02.2022 No. 64/2022, and pursuant to subparagraph 4 of paragraph 1 of the Resolution of the Cabinet of Ministers of Ukraine dated 12.03.2022 No. 263 "Some Issues of Ensuring the Functioning of Information and Communication Systems, Public Electronic Registers under Martial Law", and in order to prevent threats to national security, access to the Geological Portal services has been temporarily restricted.

On the Diia web portal at the link Database of Special Permits for Subsoil Use - Construction, Operation, Other Deposits - Data.gov.ua in Excel table format, a version of the special permits database as of 2019 is published.

The list of information from the State Register of Special Permits for Subsoil Use includes:

- registration number of the special permit;
- status of the special permit;
- date of issuance and expiration date;
- type of usage;
- name of the accounting object (deposit/site);
- type of mineral resource;
- owner of the special permit;
- address of the special permit owner.

The State Register of Oil and Gas Wells is open to users, and by checking it, you can get information by first entering keywords into the system’s search fields related to:

- well code and number;
- well name and its category;
- well location (region, district, community);
- type of object;
- well status;
- types of fluids;
- operation mode;
- type of application.

The electronic portal provides the ability to register a well in the State Register without submitting paper documents to the State Service of Geology and Subsoil of Ukraine.  

Access to the State Register of artesian wells is restricted during martial law. For registered users, the register works to provide statistics on the number of wells and the types of their use according to their purpose.

Catalog of Geological Information

The catalog of geological information keeps accessibility open for registered users, both in terms of statistics and individual sector-specific data of the GeoInfo catalog.

The catalog is useful for:

-the type of geological information (division into primary and secondary);

-the number of geological works carried out;

-the geography of geological works according to administrative-territorial units;

-an individual catalog number with the date the information was entered;

-the type of geological information;

-the owner of the geological information;

-the name of the deposit site.

Information about the state registration of geological exploration works

Data from the state registration of geological exploration works is closed due to restrictions caused by martial law. For registered users of the register, only the total number of registered geological exploration works is indicated.

Information about applications for obtaining, extending the validity, or making changes to special permits for subsoil use

This register allows you to get information about applicants for a special permit.

A downside of the register is that it is not synchronized with the State Register of Special Permits for Subsoil Use.

The register is still being formed, but considering the "closed" nature of the State Register of Special Permits, information about applicants for a special permit is displayed only partially (this concerns those subsoil users who were initially applicants and then became winners of the auction for the sale of rights to special permits).

Statistical information is available in open access.

Databases of the State Scientific and Production Enterprise 'Geoinform Ukraine' are of considerable practical interest.  

On the company's website, there are announcements about forming applications — Applications of the SSPE 'Geoinform Ukraine' in the GIS field:  

- geological data (under development);  
- cartographic services (under development);  
- electronic archives (under development);  
- open data (under development).

Environmental Impact Assessment Registry

The hardware and software system of the Environmental Impact Assessment Registry consists of fields for the notification number and date, conclusion numbers, approval numbers and dates, numbers and dates of refusals, data entry into the electronic card, numbers and dates of applications for conducting an EIA.

Saturday, November 7, 2026

The Russian view on production sharing agreements

In the Russian Federation, 3 production sharing agreement projects were implemented (Sakhalin-1, Sakhalin-2, Kharagin field).

I couldn't find any positive reviews about successful project launches, unlike six available sources that claim the opposite.

In the course of analyzing Russian specialized literature devoted to the issues of production sharing agreements, such a trend is noticeable.

Here are some of them.

1. Production sharing agreements are a public-private partnership. For example, Ukrainian legislation doesn’t include production sharing agreements in the list of public-private partnership projects. The focus of public-private partnerships is on concessions, leases, and the construction of communication, logistics, and retail infrastructure. Even though the production sharing agreement model is a form of public-private partnership, it is separated by law.

2. Production sharing agreements are civil agreements. It's quite controversial and ambiguous; production sharing agreements are more of an investment instrument of commercial law than a civil law institution. Even Russian researchers note a significant difference in the functionalities of commercial and civil law institutions.

3. Production sharing agreements are the basic foundation of tripartite arrangements among federation entities to support the local population and carry out social and cultural projects. The production sharing agreement mostly works according to work programs and budgets, rather than individual agreements, which may not be part of the appendices to the production sharing agreement.

4. Production sharing agreements are the financing of both parties through an Investment Fund. The state participates in managing the agreement by selecting project works and programs through the Investment Fund. Obviously, the Russian Federation somehow controls and influences foreign capital.

5. Production sharing agreements are all about optimizing taxes. For foreign investors, it might not be profitable to charge rent or profit fees on all the raw materials while officially having their main office registered abroad, which affects the taxation of transactional operations. At the same time, for Russian financial institutions, production sharing agreements are a way to lower VAT and income tax.

6. In production sharing agreements, the state's share is smaller (10% and 90% to the investor). The imbalance in the share distributed between the parties to the production sharing agreement comes down to the fact that, after a technical and economic assessment of the fields, it is possible that the volume of extracted raw materials will not cover the costs of extraction. Hi, projects Sakhalin-1 and Sakhalin-2.

7. Production sharing agreements are a disaster for the environment. The lack of reclamation and conservation, and the absence of waste recycling operations are the result of neglect.

8. Production sharing agreements are about localizing Russian production with more than 50% quota and using labor and equipment of Russian origin for more than 70%. Obviously, Russians see the investor as the main employer in production sharing agreements, but the stated localization percentages don’t meet the expectations of the Russian industry, which is only 35% adapted to production sharing agreements.

I'm attaching a description of Russian scientific works here.

1. Tysiachniouk, Maria, Henry, Laura A., Lamers, Machiel, Tatenhove, Jan P.M van. Oil and indigenous people in sub-Arctic Russia//Rethinking equity and governance in benefit sharing agreements.

2. N.V. Sigitova. Economical and legal mechanizm for the production sharing agreements//National Mineral Resources University "Mining", Saint Petersburg, 2013.

3. Kharagezov K. V., Sbitnev V. S. Production Sharing Agreement: Problems of Theory and Practice// Sphere of Law. 2020.

4. Zershchikova N.I. Features of the Application of Production Sharing Agreements in Russia// PROBLEMS OF EXTENDED REPRODUCTION, 2008.

5. Isaev N.V. Problems of product sharing agreements legal regulation// Bulletin of Volga University named after V.N. Tatishchev No. 2.

6. Irina Glazyrina, Sergey Lavlinskii. Transaction Costs and Prospects for Public-private Partnership in the Russian Mineral Resource Sector // International Journal of Economics and Finance, 2017

________________________________________________________________________________

The article was written amid intense missile and drone attacks on electricity, gas, heating, water supply, and sewage facilities, as well as attacks on civilian bridges during the autumn-winter period in Kyiv and other regions of Ukraine.  

In the memory of the fallen Ukrainian civilians and soldiers

Monday, November 2, 2026

Components of types of work and construction during exploration (preliminary exploration) for the development of oil and gas fields

Developing oil and gas fields is a set of geological exploration activities carried out to study the geometric (filtration-capacity), geological-industrial, and other parameters of oil and gas field discoveries, as well as to calculate the explored hydrocarbon reserves.

The components of the type of work related to the exploration (re-exploration) of oil and gas are:

- drafting geological exploration project plans;  

- drafting environmental impact assessment projects;  

- constructing exploration and injection wells;  

- preparing project and cost estimate documentation;  

- allocating and using land for construction;

- preparatory construction and installation work, soil reclamation;

-  drilling of wells;

-  well casing;

- well testing during drilling;
 
- collection of rocks and fluids during drilling and well testing;

- industrial-geophysical work, testing, well studies;

- testing in the production casing;

- reconstruction of facilities necessary for carrying out exploration work;

- author supervision of well construction;  

- elimination of accidents and complications during well construction;  

- conservation, deconservation of exploratory and test wells;  

- restoration of decommissioned wells;  

- pilot-industrial development;  

- compiling reports on completed geological exploration work;  

- state examination and approval by the State Commission of Ukraine on Mineral Reserves of reserve calculations.

Components of types of work and construction related to the development of oil and gas fields:

- design, pre-design, scientific, and survey works;  

- development of feasibility studies and preliminary construction designs;  

- approval and coordination of projects and documentation regarding the comprehensive placement of a deposit;  

- conducting technical and research works;  

- expertise of construction projects;  

- inspection of objects during reconstruction;  

- cataloging of existing productions and structures;  

- preparation of acts for land use or acquisition of ownership;  

- compensation for damages from land withdrawal to land users.

The stages of well exploration (preliminary exploration) when developing oil and gas fields can also include other work.

Design of pilot-industrial field development

Based on the approved technological indicators for the field development, project documents are prepared for its development (up to 5 years)...