Characteristics of the calculation contour of the hydrocarbon storage project in production sharing agreements

Within the design contour of the hydrocarbon storage project in production sharing agreements, there should be no tectonic disturbances that cause a decrease in the sealed base and reserve plugs.

The tightness of the detected violations, as well as the well casing environment, must be tested in industrial gas injection by means of a technological scheme of exceeding the working pressure above the hydrostatic pressure.

Technological fastenings of casing columns of underground storage facilities must:

a) evenly distribute the pressure and volume of cement mortar along the column to the wellhead throughout the wellbore;

b) replace the industrial fluid with cement mortar over the entire height.

The result of fastening the well casing strings should be in all layers of the well section.

The core is taken in the interval of reservoir layers and overlying rocks, which protrude as hatches above the accumulating layers.

The number of wells from which cores need to be taken is determined by the exploration project.

The purpose of the core is to determine reliable data on filtration capacities.

At the same time, the drilling process itself is accompanied by a complex of industrial and geophysical measurements, provided by geological and technical tasks.

The pressing of the intermediate and production string must be carried out according to the developed instructions for testing wells for tightness and the results of the work must be drawn up in the form of acts.

In turn, exploration of aquifer structures for hydrological study is based on the following indicators:

1) static groundwater levels and their regular change;

2) hydroconductivity and piezoconductivity;

3) the level of ionic-salt solutions and their relationship with hydrocarbons.

Hydrological characteristics of exploration wells are performed in the following sequence:

1) pumping out formation water;

2) deep pressure measurements;

3) chemical analysis of water samples;

4) determination of the water inflow interval.

Hydrological characteristics are built on the basis of the formed plan.

Saturday, July 18, 2026

The place and role of production sharing agreements in the Industrial Development Strategy

A week ago, at a meeting of the Cabinet of Ministers of Ukraine, the Strategy for the Development of Industries Based on Minerals and Components of Strategic and Critical Importance was approved.

The strategy was prepared for a long time, proofread, and presented to the public too quietly.

In terms of its structure, the Strategy contained a description of problems characteristic of subsoil use, immediate tasks over a period of 5 years, and included an operational plan for the implementation of measures.

It is noticeable that for the first time the Strategy is based on the mineral and raw material base, and does not contain specific directions that would be taken care of by the Ministry of Economy of Ukraine and the Ministry of Energy of Ukraine.

A positive aspect of the Strategy is its integration into the overall industrial share of the economy.

At the same time, the Strategy loses at the operational level. And the reason for this loss is the paucity of tools to achieve the goals of the Strategy's implementation.

What is the message of the Strategy:

- focus on mineral processing;

- battle for the best price for the export potential of raw materials;

- insurance risks of investments;

- total digitalization;

- development of tender procedures for the right to use deposits;

- struggle for the availability of geological information.

What is the Strategy silent about?

The Strategy equates special permits and production sharing agreements, which a priori are anti-natural economic measures.

On average, the Strategy will be considered implemented if four competitions are announced and held per year for the conclusion of production sharing agreements for the list of fields outlined by the Cabinet of Ministers, the remaining fields are planned to be put into use under the special permit procedure.

Holding a competition for the conclusion of a production sharing agreement does not guarantee its conclusion:

1) the passivity of the Interdepartmental Commission for the organization and conclusion of a production sharing agreement;

2) the inflexible approach to the investment assessment of the project;

3) legal proceedings initiated by the losing party of the competition in order to block the signing process;

4) the protracted process of approving the text of the agreements by the central executive authorities.

The technical problems described above significantly delay the implementation of the production sharing agreement by more than a year.

The strategic mistake of the government concept is that:

1) the mineral raw material base is unfairly divided into critical (strategic) and conventional minerals;

2) production sharing agreements are not considered as an investment roadmap;

3) indicators of the Strategy's achievement are built on short-term prospects without forming a philosophy of foundations in the field of subsoil use;

4) minerals are part of the economy, not its essence.

That is, the focus on supplementing energy programs with the subsoil use sector automatically puts it in a secondary position.

Dependence on international aid injections into alternative energy should not obscure the prospects of subsoil use.

Subsoil use has its own path of development.

Saturday, July 11, 2026

Conditions for the equipment of thermal energy wells

Well equipment must guarantee the implementation of the main technological and technical and economic solutions included in the well site development project.

The design of wellhead equipment for thermal power wells should have the following factors:

- volume of production fluid;

- reservoir pressures;

- fluid temperature;

- probability of salt precipitation;

- corrosiveness of the fluid;

- connection with pipes in diameter.

Depending on the water intake conditions, the equipment can be standard or individual.

In addition to technological compatibility and compliance with occupational health and safety requirements, the equipment of thermal power wells must provide measurements of temperature and pressure of fluid flow rates. 

Increased attention should be paid to flanged and threaded connections in the well shut-off valves, in the use of which corrosive elements can be observed.

The system of control and safety monitoring of the operation of well equipment should concern:

- time of working flows;

- wellhead pressure;

- temperature regime;

- chemical and gas composition of water;

- sand level;

- salt deposition.

Operational systematic observation is facilitated by constant research, which is divided into:

- current;

- control;

- special.

Current studies are conducted to identify the technological mode of operation, check the parameters of the reservoir zone and well.

Control studies are conducted according to plan and are aimed at clarifying data from current studies.

Special studies serve to identify individual factors that affect the water capacity and operating conditions of wells and their locations as a whole.

Saturday, July 4, 2026

Well preservation issues in production sharing agreements

Well conservation is a preparatory and final stage in the production process.

However, is conservation the final stage of a production sharing agreement? 

This is a very difficult fact to state definitively from the point of view of implementing a production sharing agreement.

Here is the explanation.

1. The production sharing agreement does not end with a list of wells. The parties to the agreement expand the area of ​​implementation of the industrial development program to new coordinate points.

2. Well conservation does not remove the issue of completing the environmental supervision project for the site.

3. Well conservation is financed by a separate fund.

4. Before the start of conservation, property issues of newly created objects and their legal fate are clarified.

Well preservation differs in:

1) hydrothermal wells;
2) wells with unstable static pressure;
3) in regions with low temperatures.

Conservation of hydrothermal wells begins with filling the wellbore with formation water. 

The pump and compressor pipes rise above the roof of the productive horizon by half the depth of the well.

When preserving wells with unstable static pressure, regardless of the reservoir temperature, such wells are filled with a solution.

At peak sub-zero temperatures in all conservation wells, the wellbore is filled with a 30% chloride solution.

A fountain armature with a control valve is installed at the mouth of the conservation well. 

The mouths are fenced, the armature overhangs are removed, the manometer nozzles are sealed, the flanges are equipped with plugs.

Design of pilot-industrial field development

Based on the approved technological indicators for the field development, project documents are prepared for its development (up to 5 years)...