Saturday, September 26, 2026

Protection of subsoil during well drilling

In conditions of drilling wells in depleted deposits and creating underground storage facilities, the following actions must be taken:

-prevention of open gushing of griffin formations;

- prevention of absorphion of washing fluid;

- prevention of collapses of well walls;

- prevention of interlayer flows during the development and operation of wells;

- to provide reliable waterproofing in drilled wells;

- ensure the necessary tightness and cementation of the columns lowered into the well.

All layers with signs of secondary gas bearing (technogenic occurrences), detected during drilling according to gasometry data, core analysis, geophysical logging, direct gas occurrences, must be studied with the aim of collecting and utilizing gas.

Opening of aquifers (if there is gas in the storage) is carried out by installing anti-vibration equipment at the mouths of all wells.

Geological service engineers are recommended to develop ''Uniform Technical Rules for Conducting Work When Drilling Wells'', ''Special Requirements for Well Construction'', ''Guide to Preventing Open Flow''.

The density of the flushing fluid for opening gas-saturated formations is set depending on the formation pressure and the depth of the formation.

Gas-saturated and permeable aquifers exposed by exploration wells must be isolated from each other by cementing casing strings.

When testing and operating in exploratory wells penetrating horizons, each such horizon is tested separately.

After the study is completed, the horizon is isolated by placing a cement bridge in the well. 

The tightness and reliability of the bridge is checked without fail, and the results are confirmed by a bilateral act.

Saturday, September 19, 2026

Control over the operation of an underground gas storage facility

When conducting control and special studies, the causes of reservoir disruption and sand removal to the surface are clarified, as well as the presence of fluid in the wellbore and bottomhole zone.

Gas release into the atmosphere is allowed only in exceptional cases, when the pressure in the gas collection manifold does not allow obtaining the required range of losses and depressions or before connecting wells to the gas collection point.

Piezometric and observation wells should be periodically checked for the condition of the face and, if necessary, remove plugs and provide additional perforation of the column against the formation.

For each observation well, graphs should be constructed of pressure changes depending on the amount of gas withdrawn and injected.

The procedure for monitoring the operation of an underground gas storage facility is determined by the technological scheme.

By the nature of implementation, control measures are provided in two stages: 

- during industrial operation; 

- during cyclic operation.

The essence of industrial operating systems lies in the interaction of the company's geological service with the author of the technological scheme.

During industrial operations, the following are monitored: 

 - tightness of the storage;

 - condition of the wells; 

 - filling rate is specified; 

 - formation of the occurrence contour; 

 - pressure change.

For each cycle of gas injection and withdrawal, observation and industrial study programs are developed, as well as the technological operating mode of the storage facility.

During the period of cyclic operation, the well condition is monitored, and the boundaries of the gas-saturated zone are also changed.

The geological service of the company is responsible for: 

- construction of isobar maps; 

- construction of a graph of gas consumption versus pressure during gas injection and withdrawal; 

- preparation of a profile of the admissibility and productivity of the reservoir.

Saturday, September 12, 2026

Organization of work at the underground gas storage station

By the time the underground gas storage facility is launched into cyclic operation with design parameters, the arrangement of all main structures ensuring the operation of the artificial gas deposit during gas injection and withdrawal must be completed.

The underground gas storage facility includes: 

- gas pipeline; 

- compressor facilities; 

- units (compressor shops, gas drying plant); 

- gas collection point; 

- gas preparation plants; 

- intra-industrial pipelines; 

- intra-industrial collectors.

When preparing aquifers for the transfer of explored formations and wells, territorially close to the exploration site, hydrological exploration data is checked.

Responsibility for the functionality of the underground gas storage station should be placed on the chief engineer and the chief engineer.

The technological scheme is determined by the volume and duration of gas injection and withdrawal, the periodicity of the cycle and other indicators that can be the basis for fulfilling the tasks formulated before underground gas storage.

During the operation of the gas storage facility, all wells and gas distribution points must: 

- exclude gas outflows outside the design contour; 

- exclude gas overflows into other horizons; 

- prevent the formation of condensate;

- timely completion of repair work on downhole and wellhead equipment, compressor units, gas cleaning and drying units.

The technological scheme of the gas storage project should determine: 

- volumes of industrial gas injection; 

- well operation mode; 

- procedure and scope of research.

Depending on the complexity of the geological structure of the objects and the degree of their exploration, measures must be developed to ensure the safety of industrial gas injection.

Operation of wells in underground gas storage facilities is permitted only through elevator pipes.

Saturday, September 5, 2026

Gas well exploration

The main tasks of studying gas wells during the exploration of depleted deposits in aquifers are:

- determination or refinement of the productive characteristics of wells under variable gas-dynamic conditions caused by the exploitation of gas deposits, gas injection and withdrawal, and long downtime;

- assessment of the suitability of gas saturation of the formations and filtration resistance coefficients of the surf zone of the well;

- assessment of rock stability in the bottomhole zone of the reservoir, in which there is no disruption of the rock skeleton;

- determination of the preliminary flow rate based on the conditions of water removal, mechanical impurities, and permissible pressure losses; 

- assessment of filter performance and installation of downhole equipment in wells.

The study of gas wells should be preceded by a complex of geophysical measurements to assess the technical condition.

The study of gas wells to determine the admissibility and performance characteristics is carried out without releasing gas into the atmosphere by measuring the gas and the pressure drop during gas injection and withdrawal.

Elevator pipes that descend into the well must provide:

- protection of the filtration column from corrosion and erosion, removal of liquids and solid impurities from the well bottom and prevention of the formation of bottom plugs;

- lowering of the packer filter, the screen valve;

- removal of thermobaric loads.

Depending on the composition of the reservoir rocks, the mobility of the reservoir and bottom waters, the range of pressure changes for the period of the working cycle, the regime is set:

- constant pressure and constant depression;

- constant flow rate and gas filtration rate in the bottomhole zone;

- constant pressure at the wellhead.

The well's operating mode is regulated using fittings installed at the gas collection point or wellhead.

Control of production wells should include:

- supervision of the condition of the production well fund;

- supervision of changes in costs, supervision of pressure and temperature;

- supervision of the removal of sand, water and other impurities.

Design of pilot-industrial field development

Based on the approved technological indicators for the field development, project documents are prepared for its development (up to 5 years)...