Friday, October 30, 2026

Monerary assesment of the attractiveness production sharing agreement

Сurrent, the significance and role of production sharing agreements is assessed in terms of the area of land granted for subsoil use to the investor(s), the amount of funds spent on the extraction of mineral raw materials, the volume of extracted materials, the investor(s)' share in the raw materials, the amount of funds spent by investors on social obligations, etc.

Despite established views on the valuation of production sharing agreements, the «monetary expression» of such agreements is not carried out, since there are no regulatory or design bases for such an assessment.

The foundation of the monetary valuation of production sharing agreements is the conditional «two whales»:

1) operational whale;
2) financial whale.

Operational whale

The «operational whale» is inherent in the formula for the monetary expression of production sharing agreements, which was proposed in 2010 by contract researcher Mazeel (2010) in the work «Fiscal Systems and Oil Contracts».

1. Gross income = equal’s profit.
2. Net income = total account (gross income minus royalties or other payments).
3. Taxable income = gross income minus royalties.
4. Deductions include:
a) operating expenses;
b) intangible capital expenditures;
c) depreciation;
d) loans;
e) bonuses.

Financial whale

The economic activities of the «financial whale» under a production sharing agreement are:
1) currency purchase and sale transactions;
2) the rental rate.

The only drawback of this formula, in my opinion, is:
1) that it is not applied in hydrocarbon transactions (selective);
2) the amount of refunded value added tax is not taken into account;
3) the lack of market infrastructure for the resale of the «natural asset» for investors under a production sharing agreement.

The optimal model for monetary valuation of production sharing agreements, which is closer to PSA, regardless of the mineral category, is the valuation according to the following components:

Year of production sharing agreement

 

Production value

 

Gross income after deduction of taxes and fees

 

Total amount of all bonuses

 

Group of intangible assets

and their value

 

Capital

expenditure

 

Asset price

per year

 

Total tax and rent expenses

 

Amount of tax refunds returned

 

 

 

 

 

 

 

 

 

Tuesday, October 27, 2026

Geological exploration work - as the driving force of the production sharing agreement

At various investment platforms, the idea often comes up that the economic mechanisms of extraction depend a lot on the quality preparation of auction lot objects or areas for production-sharing agreements.

And the common touchpoint of interaction, like holding an auction for the sale of a special permit for subsoil use or rights to a plot under a production sharing agreement, is the level of the state's readiness based on the carried-out geological work.

Ukraine has a funding program for conducting geological exploration work. Due to the impact of the war, funding for this program was halted for several years, but since the beginning of this year, there are signs of some support for the extractive sector from the government.

A positive sign is the recent regulatory changes. 

So, the Cabinet of Ministers of Ukraine, by Resolution No. 784 dated 17.06.2026, made amendments to the Procedure for Conducting Geological Exploration Works at the Expense of the State Budget, approved by Resolution No. 83 of 25.01.1999.

What's actually changed?

The completion of geological exploration work carried out with funds from the state budget under a geological (technical) assignment, at the request of the contractor, whose work must comply with the National Program for the Development of Ukraine's Mineral Resource Base until 2030, approved by the Law of Ukraine dated April 21, 2011 No. 3268-IV.

If geological exploration work is not included in the National Program for the Development of Ukraine's Mineral Resource Base until 2030, then such work is financed by the contractor themselves without being recorded in measurement reports.

The changes to the Cabinet of Ministers of Ukraine's resolution from January 25, 1999, have agreed on the list of geological exploration works that are funded by the Ukrainian state budget:

- geological survey and mapping;

- exploration and prospecting for all types of mineral resources, as well as preliminary exploration of promising strategic and critical deposits;

- reassessment of deposits for raw material quality;

- maintaining the state register of deposits;

- conducting monitoring of the geodetic environment.

It's worth diving into the details of hydrological work:

- monitoring groundwater and exogenous geological processes, as well as the geochemical state of landscapes;

- geological and ecological studies;

- assessing the condition of groundwater resources;

- inventorying well equipment;

- construction, setup, and reconstruction of buildings and structures;

- maintenance of core storage facilities;

- accreditation of geological enterprise laboratories.

The purchase of geological work is announced through tender procedures.

After making the purchases, the client of the geological exploration work creates the tasks and communicates them to the contractor.

Based on geological survey tasks, the performers develop project-specific plans according to the budget. 

The total estimated cost is determined based on the general cost norms, the list of names and professions of the geological survey workers, the tariff rates, and the catalog of base prices for material resources.

The calculation of the total estimated cost includes:

- expenses for work done by your own team;

- expenses for contractors;

- expenses for tools, materials, machines;

- expenses for conducting a cost assessment.

Carrying out geological exploration work is done based on the contract, the indicators of the geological assignment, the volume of expenses for the work, the project, and the list of tasks for geological study.

The technical specification may also include a schedule, to which a plan is attached.

Accounting of geological exploration work (except for scientific research) is carried out based on measurement acts with the specification of the nomenclature.

Payment for geological exploration work is made after signing the acceptance certificate for the completed technical task. 

A report is prepared for completed tasks, which is sent to the State Scientific-Production Enterprise 'State Information Geological Fund of Ukraine' (Geoinform), or based on the minutes of the contractor's scientific and technical council meeting, it is sent to the customer without the need to additionally provide the report to Geoinform.

Saturday, October 24, 2026

Feedback on the article "The development and use of the production sharing agreement law in the Uzbekistan oil and gas" by Michael P. Barry

In 2006, a study of Uzbek legislation on the conclusion and implementation of production sharing agreements was published in the journal "Central Asia and the Caucasus".

This professional study is a significant part of future comparative legal works on the application of production sharing agreements.

Among the key aspects of the article, I will highlight the following: 

- strengthening the presidential regulatory vertical in the formation of legislation on production sharing agreements; 

- the state, as a player in the oil and gas market, participates in production sharing agreement projects; 

- activity in production sharing agreements must have a share in the state operator's agreement.

If we compare the theses from the study with the current model of production sharing agreements in Ukraine, the Uzbek formula as of 2000 reflected similar features of agreement models in the post-Soviet space.

In any case, due to the antiquity of the study, it is necessary to analyze the changes that have occurred since 2000 until today.

The only thing I didn't like about the published article was the feeling, using the example of Uzbekistan, of the author's bias towards countries implementing projects under production sharing agreements, in which the president of the state is part of the power vertical, which theoretically could negatively affect relations with the investor.

I understand that this is the author's opinion, however, this conclusion is likely to scare away investors.

In order to popularize the study and highlight its prominent place in the world specialized literature on production sharing agreements, I will provide some citations.

"Uzbekistan's probable natural gas reserves are approximately 5.1-6.25 trillion cubic meters, with commercial reserves of about 1.62 trillion cubic meters, making the Uzbekistan the world's 10th largest natural gas producer. 

Commercial gas reserves in Uzbekistan are double those located in Britain, which is Europe's largest gas producer, and the Uzbek national holding company Uzbekneftegaz claims the country has developed less than 23% of it is gas resources''.

Friday, October 16, 2026

Warning about air basin pollution

Sources of air pollution in the area of the storage sites can be:

a) the purge spark plug of the compressor workshop, through which purging takes place;

b) release of gas from the pipelines;

c) a blowdown valve in the gas field area, through which blowdown of pipelines, separators, and other technical units takes place;

d) non-sealed wells;

e) loose valve fittings;

f) flange connections;

g) gland seals;

A source of air basin pollution in the gas field area can also be the production wells developed after drilling, operational wells during their testing, and open fountains.

To prevent air pollution in the surrounding area, sanitary zones should be defined in modernization projects, with their boundaries determined depending on the specific conditions of the storage sites.

Saturday, October 10, 2026

Protection of subsoil during the intensification of production wells in the context of production sharing agreements

The main conditions for subsoil protection when implementing various measures aimed at increasing well productivity by affecting the near-wellbore area are:

- preserving casing strings;

- preserving the integrity of the cement ring;

- prevention of formation collapse in the near-wellbore area;

- preventing the expected dehydration of the well and artificial gas deposit as a result of individual layer exploitation.

It is forbidden to carry out intensification work on technically faulty wells when there is a danger of gas crossflow between layers and loss of sealing in the annular space.

It is not allowed to carry out well stimulation work in wells where the natural separation between gas-bearing and water-bearing layers is small.

If before working on the near-face zone of the seam there was no disturbance of the seam structure or rock displacement, but after the work there was penetration into part of the rock, you need to stop using the well.

The well is equipped with a filter.

Intensification measures should be carried out after conducting experimental studies in order to obtain data on process parameters.

The design, number, and location of absorption wells for discharging and disposing of industrial waste are determined by the process map and its appendices.

Absorption wells, regardless of their location, must be gas-tight and tested at the storage operating pressures.

In case of wellbore blockage and loss of connection with the formation, measures should be taken to restore the well.

When leaks are detected through wellhead equipment and flange connections, wells need to be shut down and the leaks eliminated.

All measures to eliminate leaks and improve the tightness of the column should be taken immediately after defects are detected.

At the same time, it is necessary to identify the composition of the gas and the direction of flows if leaks are detected at the control horizons.

Based on the obtained data, a program for repairing defective wells and an assessment of repair and restoration measures should be prepared.

Sunday, October 4, 2026

Protection of subsoil during the operation of underground gas storage facilities

When developing individual aquifers (deposits), conditions must be maintained that exclude the interaction of the developed horizon with other horizons used as control, absorbing, and suitable for development in the future.

The creation and operation of underground gas storage facilities must take place at injection and withdrawal pressures, excluding the opening of cracks, destruction of the rock skeleton in the bottomhole zone of the well, and pulling the water cone up to the bottomhole in operating wells.

The creation and operation of underground gas storage facilities should not destroy the cement stone behind the column.

Monitoring the correct operation and underground storage of gas should be carried out during regular inspections, which are carried out in accordance with special storage facility operation programs.

If pressure or griffons are detected during gas injection in the intercolumn environment of the well, well operation is stopped.

Operation of a well with a violation of the tightness of the column or flange connections is not allowed. 

In wells where flows or interlayer flows have occurred, repair work must be carried out to eliminate them.

If it is impossible to eliminate the above cases, the well must be liquidated while maintaining the isolation of gas-saturated horizons.

When detecting gas accumulation in horizons, the appearance of gas on surfaces (griffins), gas flow beyond the boundaries of the closing isogypsum caused by pressure injection, depressurization of the overlying rocks, it is necessary to:

- stop gas injection;
- reduce pressure in the horizons (layers);
- create a leak elimination plan.

To monitor the timely detection of gas leaks, simultaneously with pressure measurements in wells, the following should be carried out:

- observation according to the well technological scheme; 
- survey for detection of gas emissions.

Monthly records of removed fluid must be kept for all production wells that produce water along with gas.

Design of pilot-industrial field development

Based on the approved technological indicators for the field development, project documents are prepared for its development (up to 5 years)...