Investors in production sharing agreements, as well as subsoil users operating under special permits for hydrocarbon extraction, are interested in developing a storage network, and sometimes express a desire to become an investor in a storage construction project.
What does the construction of a storage facility start with?
Technical documentation for the construction of an underground storage facility can be developed for the structural aquifer or depleted source as a whole, as well as separately for aquifers (horizons) or depleted deposits.
In any case, it is necessary to carry out technical and economic calculations to confirm the priority of development of horizons or deposits, taking into account the possibilities of expanding storage facilities.
If it is necessary to make significant changes to the approval of technological schemes, the latter is revised.
The technological scheme section covers the following issues:
- confirmation based on structural constructions and gas-dynamic calculations of the volumes of active and buffer gas, the contour of gas distribution over the area;
- linking these volumes with data on gas distribution irregularities;
- data on gas saturation of the region;
- injection pressure at the end of gas withdrawal;
- selection of the number, confirmation of the location and design of production and exploration wells;
- development of a survey map of the area with the marking of the gas transportation system, place of origin, main consumers;
- development of a map in the base of the reservoir, aquifer;
- development of maps of the geological and geophysical section;
- development of profiles on aquifers;
- development of a gas preparation scheme.
The storage facility development project must include designs, specify the volume and cost of all work, and compile technical, economic, and other indicators.
Compressor units, gas industry and auxiliary equipment must be highly productive and reliable means of operations.