In order to get reliable information for an accurate calculation of hydrocarbon reserves for approval, an experimental industrial development is being carried out.
To calculate hydrocarbon reserves and design field development systems during the geological exploration process, the following characteristics must be identified:
- geological and structural features of the reservoirs;
- limit and average parameters of the productive horizon reservoirs, their distribution across the area and in cross-section;
- filtration characteristics of the reservoirs based on the results of gas-dynamic studies;
- positions of oil-water and gas-oil contacts;
- physical and chemical properties of formation fluids.
At the site planned for pilot-industrial development, there should be productive exploration and appraisal wells, with study results that provide the necessary information to prepare the project.
Before starting pilot-industrial development in these wells, the following should be carried out:
- geological and industrial research and geophysical studies based on the physical-geological characteristics of the layers;
- study the physical and chemical properties of oil, gas, and condensate;
- determine the presence or absence of an oil rim;
- provide a justified assessment of the feasibility of developing a condensate field under a gas reservoir depletion regime without pressure maintenance;
- resolve issues of product transportation and the use of associated minerals;
- disposal of waste/industrial water;
- obtain permits for land development projects and approvals from the State Labor Service of Ukraine.
No comments:
Post a Comment