Protection of subsoil during the operation of underground gas storage facilities

When developing individual aquifers (deposits), conditions must be maintained that exclude the interaction of the developed horizon with other horizons used as control, absorbing, and suitable for development in the future.

The creation and operation of underground gas storage facilities must take place at injection and withdrawal pressures, excluding the opening of cracks, destruction of the rock skeleton in the bottomhole zone of the well, and pulling the water cone up to the bottomhole in operating wells.

The creation and operation of underground gas storage facilities should not destroy the cement stone behind the column.

Monitoring the correct operation and underground storage of gas should be carried out during regular inspections, which are carried out in accordance with special storage facility operation programs.

If pressure or griffons are detected during gas injection in the intercolumn environment of the well, well operation is stopped.

Operation of a well with a violation of the tightness of the column or flange connections is not allowed. 

In wells where flows or interlayer flows have occurred, repair work must be carried out to eliminate them.

If it is impossible to eliminate the above cases, the well must be liquidated while maintaining the isolation of gas-saturated horizons.

When detecting gas accumulation in horizons, the appearance of gas on surfaces (griffins), gas flow beyond the boundaries of the closing isogypsum caused by pressure injection, depressurization of the overlying rocks, it is necessary to:

- stop gas injection;
- reduce pressure in the horizons (layers);
- create a leak elimination plan.

To monitor the timely detection of gas leaks, simultaneously with pressure measurements in wells, the following should be carried out:

- observation according to the well technological scheme; 
- survey for detection of gas emissions.

Monthly records of removed fluid must be kept for all production wells that produce water along with gas.