Development of thermal energy water deposits

Thermal power development projects are formed either for individual areas of birth places or layers (lack of hydrodynamic connection between layers) or for the place of occurrence as a whole.

Development projects are drawn up on the basis of approved operational reserves of thermal energy waters, study of well drilling and core data, industrial geology and geophysics materials, results of hydrological studies, documents obtained as a result of exploration.

Industrial exploration projects are developed for a period of up to 5 years at the location of the deposit with unconfirmed reserves.

The designer supervises the implementation of the development project and issues recommendations to improve the development status.

The project for the development of the place of birth of thermal energy waters provides a comprehensive solution to the main technological and technical and economic issues related to the maximum extraction of discovered thermal energy waters

The development project must contain the following provisions:

a) initial geological and industrial data obtained in the process of exploration and reconnaissance work;

b) justification of the selected development system, annual production levels, technological operation mode of wells, feasibility of maintaining reservoir pressure;

c) justification of the system and place of waste water discharge;

d) program and scope of work on the study of wells;

e) initial data for drawing up the development project.


The first section of the project should contain:

a) general data about the area, physical-geographical and climatic conditions;

b) brief data on geological studies indicating the number of drilled wells and technical characteristics;

c) brief stratigraphy indicating aquifers;

d) tectonic structure of the area and place of origin;

e) hydrological characteristics of the place of origin;

f) brief physical-lithological and thermophysical characteristics of productive horizons;

g) data on physical-chemical properties.


The second section of the project includes:

a) justification of operational facilities and selection of the development system;

b) development of operational flows;

c) well operation conditions;

d) recommendations for additional exploration of the location;

e) selection of the order and sequence of drilling and commissioning of wells;

e) selection of the method of opening the board and intensification of water production;

g) selection of well design taking into account the geological and tectonic parameters of the formation, water composition, bottomhole, thermal insulation;

g) calculations of changes in formation and bottomhole pressure, water composition temperature in degrees, salt formation conditions;

h) injection of waste water into the formation.


The third section of the project includes:

a) data on the utilization of thermal energy water;

b) basic technical and technological solutions;

c) a set of research works.


The fourth section of the project includes:

a) justification for drilling observation wells;

b) control over changes in flow rates;

c) determination of the limit levels of permissible reduction in reservoir pressure and reservoir temperature.

No comments:

Post a Comment

Design of pilot-industrial field development

Based on the approved technological indicators for the field development, project documents are prepared for its development (up to 5 years)...