Saturday, September 19, 2026

Control over the operation of an underground gas storage facility

When conducting control and special studies, the causes of reservoir disruption and sand removal to the surface are clarified, as well as the presence of fluid in the wellbore and bottomhole zone.

Gas release into the atmosphere is allowed only in exceptional cases, when the pressure in the gas collection manifold does not allow obtaining the required range of losses and depressions or before connecting wells to the gas collection point.

Piezometric and observation wells should be periodically checked for the condition of the face and, if necessary, remove plugs and provide additional perforation of the column against the formation.

For each observation well, graphs should be constructed of pressure changes depending on the amount of gas withdrawn and injected.

The procedure for monitoring the operation of an underground gas storage facility is determined by the technological scheme.

By the nature of implementation, control measures are provided in two stages: 

- during industrial operation; 

- during cyclic operation.

The essence of industrial operating systems lies in the interaction of the company's geological service with the author of the technological scheme.

During industrial operations, the following are monitored: 

 - tightness of the storage;

 - condition of the wells; 

 - filling rate is specified; 

 - formation of the occurrence contour; 

 - pressure change.

For each cycle of gas injection and withdrawal, observation and industrial study programs are developed, as well as the technological operating mode of the storage facility.

During the period of cyclic operation, the well condition is monitored, and the boundaries of the gas-saturated zone are also changed.

The geological service of the company is responsible for: 

- construction of isobar maps; 

- construction of a graph of gas consumption versus pressure during gas injection and withdrawal; 

- preparation of a profile of the admissibility and productivity of the reservoir.

No comments:

Post a Comment

Design of pilot-industrial field development

Based on the approved technological indicators for the field development, project documents are prepared for its development (up to 5 years)...