Gas well exploration

The main tasks of studying gas wells during the exploration of depleted deposits in aquifers are:

- determination or refinement of the productive characteristics of wells under variable gas-dynamic conditions caused by the exploitation of gas deposits, gas injection and withdrawal, and long downtime;

- assessment of the suitability of gas saturation of the formations and filtration resistance coefficients of the surf zone of the well;

- assessment of rock stability in the bottomhole zone of the reservoir, in which there is no disruption of the rock skeleton;

- determination of the preliminary flow rate based on the conditions of water removal, mechanical impurities, and permissible pressure losses; 

- assessment of filter performance and installation of downhole equipment in wells.

The study of gas wells should be preceded by a complex of geophysical measurements to assess the technical condition.

The study of gas wells to determine the admissibility and performance characteristics is carried out without releasing gas into the atmosphere by measuring the gas and the pressure drop during gas injection and withdrawal.

Elevator pipes that descend into the well must provide:

- protection of the filtration column from corrosion and erosion, removal of liquids and solid impurities from the well bottom and prevention of the formation of bottom plugs;

- lowering of the packer filter, the screen valve;

- removal of thermobaric loads.

Depending on the composition of the reservoir rocks, the mobility of the reservoir and bottom waters, the range of pressure changes for the period of the working cycle, the regime is set:

- constant pressure and constant depression;

- constant flow rate and gas filtration rate in the bottomhole zone;

- constant pressure at the wellhead.

The well's operating mode is regulated using fittings installed at the gas collection point or wellhead.

Control of production wells should include:

- supervision of the condition of the production well fund;

- supervision of changes in costs, supervision of pressure and temperature;

- supervision of the removal of sand, water and other impurities.